Changes between Version 1 and Version 2 of ISSM-Planetary


Ignore:
Timestamp:
06/02/11 12:12:14 (14 years ago)
Author:
Mathieu Morlighem
Comment:

Added some stuff

Legend:

Unmodified
Added
Removed
Modified
  • ISSM-Planetary

    v1 v2  
     1== April 29th 2011 ==
     2
    13Get ISSM Dev access to Mathieu and Julie.
    24
    35start a workshop:
    4 - cross disciplinary science in ice shells across the solar system.
    5 - July framework.
     6 - cross disciplinary science in ice shells across the solar system.
     7 - July framework.
    68
    79
     
    1012
    1113roses:
    12 - Outer Planet Research Program (end of October, NOI August)
    13 - IDS (NOI Oct 2011, Jan 2012)
     14 - Outer Planet Research Program (end of October, NOI August)
     15 - IDS (NOI Oct 2011, Jan 2012)
    1416nsf: ?
    1517
     
    2527
    2628June 2012:
    27 - relevant litterature for Julie.
    28 - relevant litterature for spherical model. viscous.
    29 - scope out effort needed for sphericization of equations
    30 -> goal is for a spontaneous, or an augmentation.
     29 - relevant litterature for Julie.
     30 - relevant litterature for spherical model. viscous.
     31 - scope out effort needed for sphericization of equations
     32 -> goal is for a spontaneous, or an augmentation.
    3133
    32 July 2012:
     34== June 2d 2011 ==
    3335
     36October 1st: Spontaneous Concept.
     37September 1st: Workshop (1day, internal jpl, across div)
     38
     39Tidal stress mapping: Julie -> send equations.
     40 - Plotting a tidal bulge through time.
     41 - Plotting resulting surface stresses through time.
     42 - Plotting secondary eigen directions -> map into existing rift systems.
     43 - Links with: Alyssa Roden, Johnatan Mitchell.
     44
     45Premature at this stage:
     46 - Inter-divisional noon seminar:  32-33-35 Marty Barmatz organize (potential wam). Organize. cc Greg Davis.
     47 - Somebody 32-> scientific rational. What could ISSM be used for in terms of science. Mathieu?
     48 - 35-> technical implications. H. M. and E.: present ISSM.
     49 - Present results on both sides.
     50
     51Final strategy:
     52 - Topical Feb 2012 (concept paper)
     53 - Roses FY12.