ISSM/ECCO2 coupling work plan

Science question

  • Sensitivity to SAM will be computed from CS510 ocean-only 10 years of hi-SAM vs 10 years of low SAM
  • Provide Pine Island Glacier domain boundary conditions ocean ~1-1.5 km PIG domain to match ISSM

Implementation

Coupling algorithm

  • Initial cavity
  • Run MITgcm for a month -> send melt rate and other results to ISSM
  • Run ISSM for this same month -> send the basal temperature, new cavity geometry, ... to MITgcm
  • Iterate for about 10 years

The two models would be run sequentially for now.

work plan

  • Menemenlis/Schodlok
    • send instruction how to run MITgcm
    • finish PIG
    • sort out shelf-ice package
    • baseline global integration with JRA25
    • 10-year hi-SAM on CS510
    • 10-year lo-SAM on CS510
    • provide our PIG grid to ISSM
  • ISSM team
    • write a module to interpolate/write ice thickness on the ocean PIG grid
    • write module to read/interpolate heat flux and melt rate from ocean solution on PIG grid to ISSM grid

July 15 DRDF meeting

  • Science action items
    • Michael will provide a lat/lon grid of melting rate on 1-km PIG grid.
    • There is going to be some incompatibility in the location of the shelf and grounding line, initially. That's OK, just set to zero anywhere where there is a mismatch.
    • ISSM team will run something and provide with a time series of ice shelf thicknesses.
    • ISSM will also provide ECCO2 with grounding line.
    • DM will apply these to a regional PIG domain ...
  • Technical action items
    • give you the 5km and the 1km grid and you will start thinking about mapping modules between the two grids
    • request accounts for trac for Michael and Dimitris so we can access wikihttp://s383-rhat/trac/issm/wiki/ISSM-ECCO2
  • Next meeting jul 23 - DM will check ORSL availability and email

July 23 DRDF meeting

October 4 DRDF meeting

  • Michael & Dimitri - diagnose + fix crash of ocean-PIG domain
  • Dimitri - work on BBL
  • Todd - get JPL account + access to trac + forward level-set method documentation
  • will work on level-set, i.e., track interface between ice and water
  • Eric L & Eric R- diagnose cause of excessive accumulation and find a solution
  • parameter tuning on initial boundary coditions and forcing
  • set surface mass balance and melt rate to what they should be and then fix the other parts
  • next meeting Monday 18, 9:30am