Changes between Version 2 and Version 3 of ISSM-ECCO2


Ignore:
Timestamp:
07/19/10 07:25:01 (15 years ago)
Author:
Mathieu Morlighem
Comment:

formatting

Legend:

Unmodified
Added
Removed
Modified
  • ISSM-ECCO2

    v2 v3  
    3535
    3636
     37== July 15 DRDF meeting ==
     38
     39 * Michael has two ongoing integrations
     40   - with perpetual high SAM and perpetual low SAM, respectively.
     41   - http://ecco2.jpl.nasa.gov/data1/meeting/ISSM-ECCO2/samforcing_mps.ppt
     42
     43 * Science action items
     44  - Michael will provide a lat/lon grid of melting rate on 1-km PIG grid.
     45  - There is going to be some incompatibility in the location of the shelf and grounding line, initially.  That's OK, just set to zero anywhere where there is a mismatch.
     46  - ISSM team will run something and provide with a time series of ice shelf thicknesses.
     47  - ISSM will also provide ECCO2 with grounding line.
     48  - DM will apply these to a regional PIG domain ...
     49
     50 * Technical action items
     51  - give you the 5km and the 1km grid and you will start thinking about mapping modules between the two grids
     52  - request accounts for trac for Michael and Dimitris so we can access wikihttp://s383-rhat/trac/issm/wiki/ISSM-ECCO2
     53
     54 * Next meeting jul 23 - DM will check ORSL availability and email
    3755
    3856
    39 
    40 
    41 July 15 DRDF meeting
    42 
    43 Michael has two ongoing integrations
    44 with perpetual high SAM and perpetual low SAM, respectively.
    45 http://ecco2.jpl.nasa.gov/data1/meeting/ISSM-ECCO2/samforcing_mps.ppt
    46 
    47 - science action items
    48 
    49   Michael will provide a lat/lon grid of
    50   melting rate on 1-km PIG grid.
    51 
    52   There is going to be some incompatibility
    53   in the location of the shelf and grounding
    54   line, initially.  That's OK, just set to
    55   zero anywhere where there is a mismatch.
    56 
    57   ISSM team will run something and provide
    58   with a time series of ice shelf thicknesses.
    59   ISSM will also provide ECCO2 with grounding line.
    60 
    61   DM will apply these to a regional PIG domain ...
    62 
    63 - technical action items
    64 
    65   give you the 5km and the 1km grid
    66   and you will start thinking about
    67   mapping modules between the two grids
    68 
    69 request accounts for trac for Michael and Dimitris
    70 so we can access wiki
    71 http://s383-rhat/trac/issm/wiki/ISSM-ECCO2
    72 
    73 next meeting jul 23 - DM will check ORSL availability and email
    74 
    75